-Project Scope Statement: Using the information established in the project charter and additional research, create the Project Scope Statement using the template provided above.-Following the sample from the Project Templates above, create a WBS for your Project.THE PROJECT IS OPENING A COFFEE SHOP. I will attach the week 1 I already completed.ATTACHMENTSproj586_w2_wbs_sample_4_18_2019.pptxproj586_w2_scope_statement_template.docx
proj586_w2_wbs_sample_4_18_2019.pptx

proj586_w2_scope_statement_template.docx

Unformatted Attachment Preview

WBS – Outline Format
1 Baseball Stadium Project
(Level 0)
1.1 Site Preparation
(Level 1)
1.1.1
1.1.2
1.1.3
1.1.4
1.1.5
1.1.6
Stadium site clearing (Level 2)
Building demolition
Construction site setup
Support piling
Lower concrete bowl
Main concourse
1.2 Installation
1.2.1
1.2.2
1.2.5
1.2.4
1.2.6
1.2.3
1.2.7
1.2.8
Playing field installation
Upper steel bowl
Jumbotron
Luxury boxes
Stadium infrastructure
Seats
Steel canopy
Lights
1.3 Construction
1.3.1
1.3.3
1.3.2
1.3.4
1.3.5
Roof supports
Roof tracks
Roof construction
Roof installation
Inspection
You can also see WBS examples in the PMBOK® Guide in Section 5.4 – Create WBS.
WBS – Graphical Format
1.0 Baseball
Stadium Project
1.1 Site
preparation
1.2 Installation
1.3 Construction
1.1.1 Stadium
site clearing
Playing field
installation
Roof supports
1.1.2 Building
demolition
Upper steel
bowl
Roof tracks
1.1.3
Construction
site setup
Jumbotron
Roof
construction
Support piling
Luxury boxes
Roof installation
Lower concrete
bowl
Stadium
infrastructure
Inspection
Main concourse
Seats
Steel canopy
Lights
You can also see WBS examples in the PMBOK® Guide in Section 5.4 – Create WBS.
Project Scope Statement
Project Name
Project
Number
Prioritization
Project Manager
Owner(s)
Statement of
Work—
Project
Description
and
Project
Product
This section is typically a detailed amplification of the project SOW and mission
from the Project Charter. This also includes how you intent to accomplish the
project. “We intend to do this. . . and here are the steps we intend to use to
accomplish the project.”
This section is typically a detailed amplification of the SOW product description
from the Project Charter. What will the product of the project look like or what
should it be able to do when completed?
Project
Deliverables
What are the tangible outputs or services of this project? What big-picture
items will have to be created or performed in order to accomplish the
statement of work? These are the deliverables to be found in the WBS.
Project
Objectives
What are the cost, schedule, and quality objectives of this project?
Project
Assumptions
What are the assumptions on which the project is based?
Project
Constraints
What are the major limiting factors that affect the project?
Exclusions
Acceptance
Criteria
What are the boundaries of the project? What is to be included and what is to
be excluded from the project?
What must the product be able to do when completed to be acceptable to the
customer? What standards or regulations must the product meet? What
performance specifications must the product meet to be acceptable to the
customer?
Technical
How should the product work? What features should it have? What
Requirements functionality must it have?
Type Name
Project Manager Approval:
APPROVALS
Signature
Date
Customer/Sponsor Approval: